Watercolor illustration based on reference photos of Hallies Cove, not a photograph of one view

Property owners

Hallies Cove Landscaping

Make your Hallies Cove yard a place to relax and gather. Bring planting, lawn and irrigation into a plan that cares for your trees, protects drainage and fits your lot's rules.

Get a quote

Illustration based on reference photos of Hallies Cove. Not a single literal view.

On this page

Make room to relax, gather and enjoy your Hallies Cove yard. A good plan brings planting, lawn and irrigation together. It cares for your trees. It keeps water flowing safely. Start with your lot's rules and the right reviewer. That way you can build the approved design with fewer surprises.

Leer en español

Prepare your plan and get written approval

  1. Confirm the application, reviewer and fee.

    Settle the manager conflict before submitting. The older DAMC page asks for plans at least 30 days before work. Confirm the current route. Also confirm the date the Architectural Control Committee, or ACC, receives a complete request.[1][2]

  2. Draw the full project.

    Start with a survey or site plan. Show property lines, building setbacks and easements. Also show drainage, existing trees and changes. Include beds, lawn, trees and edging. Add paving, walls, irrigation, lighting and screening. Give plant names, sizes and quantities. That helps the reviewer understand the design.[3][4]

  3. Wait for written approval.

    Get written approval of plans and specifications first. That applies before building, placing or changing improvements. Landscaping plans need ACC approval before installation. A nearby yard's approval covers that yard only. The clock is 30 days after receipt. Plans not approved by then are treated as disapproved.[3]

  4. Start on time and keep the closeout records.

    Begin within 90 days of approval. Approval lapses on day 91 if work has not begun. The ACC may set start and finish deadlines. Confirm those dates in the decision. Also ask whether completion photos are still needed under the current process.[3][1]

What to include with the plan

The older two-page application asks for a survey where needed. It also asks for the work's location, materials and color samples in PDF format. It asks for a separate application for each improvement. Include the contractor's name and proposed start and finish dates. Use those items to prepare while the current manager confirms the form. Plant names, sizes and quantities help explain the design. A named plant palette has not been verified in the located rules.[4][3]

Keep the written decision, approved plan and conditions together. You have 30 days from the ACC's decision. Use that time to request a Board appeal in writing. A variance is an exception to the rules. It needs Board approval as well as ACC action. It does not approve the same exception for another lot. Appeals and variances apply when needed. They are not a second routine approval for every project. Current law may affect review and appeal rights.[3]

For a new home, finish approved landscaping within 90 days. The clock starts when home construction is complete. Areas designated to remain natural count as landscaped under this clause. Get the natural-area designation settled through review. Do that before relying on it. Community approval also leaves permit, utility and easement duties in place.[3]

Plan drainage, access and corner views

Keep runoff paths open

Get the subdivision's Master Grading Plan. It is available to owners on request. Keep its basic grades and drainage. A change needs the Declarant's written consent. Beds, walls, fill and fences must not block established runoff. Fences across surface runoff need openings for water to pass through. Obtain the plan and confirm the required consent before work.[3]

A January 2026 assignment moves the former Declarant's rights and duties. They pass from HLH Development, LLC to HLH Properties, LLC. The effective date is December 31, 2024. Confirm the current authorized contact before sending a drainage request.[5]

Use your lot's easements and plat

Check the utility and drainage easements for your lot. CPS notes reserve utility access. They also reserve the right to remove trees or objects that interfere with facilities. Older sheets prohibit buildings, concrete slabs and walls. That ban covers the marked utility easements. The 2026 sheets describe a utility encroachment-agreement route. Use the recorded plat and easement documents for your property. These requirements differ.[6][7][8]

Some plats show floodplain and drainage areas. Other plats place their unit outside the mapped floodplain. That reflects the map used at recording. Check today's flood and drainage requirements. Do this before grading, paving or building. Those older notes do not settle the current status of every home.[9][10][8]

Minimum setbacks

The 2018 First Amendment replaced Section 3.5 of the declaration. It sets minimum setbacks for every dwelling and improvement: 25 feet at the front, 10 feet at the sides and 20 feet at the rear. Up to 20 linear feet of the dwelling's width may sit as close as 10 feet from the rear line. Eaves, steps and porches, open or covered, do not count as part of the dwelling. Stricter setback lines on a recorded plat still control.[11]

Hallies CoveIllustrative, not to scale
Hallies CoveIllustrative diagram, not to scale: Hallies Cove for the community Hallies Cove. Front edge, facing a street: building setback 25 feet (source 11). Rear edge: building setback 20 feet (source 11). Interior side edge: building setback 10 feet (source 11).ABC

Hover over the drawing to magnify it.Press and hold the drawing to magnify it.With a keyboard, focus the drawing and press Enter or Space to open the magnifier, use the arrow keys to move it and Escape to close it. Every distance is also listed below.

  • AFront (street): Setback 25 ft [11]
  • BRear: Setback 20 ft [11]
  • CInterior side: Setback 10 ft [11]
  • Property boundary
  • Building setback (no buildings past this line)
  • Vegetation preserve (natural vegetation stays)
  • Easement (utility or drainage access)
  • Project footprint (proposed work)

The dashed lines mark where buildings may not go. Inside the setback lines, other limits (easements, ACC) still apply.

Band widths are drawn in proportion to each other; the lot is a schematic rectangle, not a survey.

Leave clear views at corners

Keep fences, walls, hedges and shrubs out of corner sight lines. That clear zone runs between three and six feet above the roadway. Within the stated intersection area, keep tree foliage high. It must be at least six feet above the nearby ground. The reviewed wording leaves the triangle's dimensions unclear. Have the reviewer and City mark the sight area on your survey. Do this before planting near a corner.[3]

Trees, plants, lawn and irrigation

Keep at least two trees

Every lot must have at least two trees at all times. After the owner has occupied the home, a tree-removal rule applies. It protects trees more than three inches in caliper. Caliper is measured six inches above grade.[3]

Removal exceptions cover diseased, dead or unsafe trees. They also cover trees removed to help others grow. ACC-approved removal is excepted too. Keep photos and an arborist's assessment where useful. Ask how to document the exception before cutting. Keep the two-tree minimum in your plan.[3]

If the rule is broken, even by accident, there is a consequence. The Board may require one or more comparable replacement trees. It may set their size and location to address the damage. This rule names no particular species.[3]

Check plant and lawn choices before buying

A named plant-species list or turf type was not found. The declaration, amendments, policies and readable plat notes reviewed do not name one. Additional ACC standards may exist. Get the current landscape standards and approval for your design. Do this before buying plants. This page has no species cards. The located rules name no species to show.[3]

Landscape the visible unpaved parts of your lot. Care for all trees, shrubs, grass and other plants. That includes the back yard, even when hidden from view. Water, mow, trim, prune, control weeds and remove dead plants promptly. Keep curbs free of weeds, trash, dirt and debris.[3]

A general turf percentage and named approved sod remain unverified. So does permission for synthetic turf. None appears in the reviewed text. Get a written decision on the design you want.[3]

Plan a water-wise yard

State law protects drought-resistant landscaping, water-conserving natural turf and efficient irrigation. A detailed plan may still be required. Gravel, rocks and cacti may be regulated. Even so, protected landscaping or turf must not be unreasonably denied. Submit the full design for review, including rock areas and plants.[12]

Screen plumbing devices the Board finds conspicuous. That includes backflow preventers and pressure-relief valves. Use landscaping or decorative rock with prior written ACC approval. Show the screen on the plan. Keep service access and operating clearances open.[3]

Confirm your address's water provider and current watering stage. Do this before setting the controller. This review has not verified them for every Hallies Cove lot.

State law limits certain fines during a mandatory residential watering restriction. The limited fines cover brown or discolored plants, turf installation and green-plant requirements. The limit applies where the restriction could reasonably cause the condition. The protection has a time limit too. It lasts until the 60th day after the restriction is lifted. Other landscape duties and the utility's watering rules still apply.[12]

Fences, lighting and other outdoor work

Have fence material and location reviewed. The rules include a six-foot fence standard. There are special requirements for lots beside the 70-foot FM 1518 landscape buffer. Check whether your lot touches that buffer before using its fence rule.[3]

The 2017 development standards also describe a 70-foot landscaped frontage buffer. It uses shrubs, trees and berms in place of an eight-foot masonry wall. This shared frontage requirement applies to that area. It does not give each private yard a species palette.[13]

Get ACC approval for outdoor, landscape or sports lighting. The exception is lighting installed on the home when built. Include fixture types and locations in your plan.[3]

Rules also reach structures, exterior colors, parking and storage. Signs, animals, rentals and other uses are covered too. Check current law and permits before relying on an older clause. State law protects some pool enclosures and security measures. It still allows certain regulation.[3][12]

Fees, fines and maintenance charges

Confirm the review cost

A reasonable submission fee is allowed. A fixed current landscape fee remains unverified. A complex request may need an architect or engineer hired by the ACC. That review cost is charged to the owner. Ask for the fee and any added costs before submitting.[3]

Property-transfer charges in the 2026 management certificate apply to transfers. They are not the price for a landscape application or tree-removal request.[2]

Keep the fine rules separate

The ordinary fine is $25 per violation. The total limit is $1,000 for a single violation in 12 months. An exception appears in Section 7.4. Before a fine, notice and hearing requirements apply. They come from Texas Property Code 209.006 and 209.007. The reviewed policy gives no daily fine schedule.[14]

A separate drainage-dumping rule allows a fine up to $5,000 per occurrence. It covers dumping rubbish, debris or trash in the subdivision drainage system. Repair and removal costs may also apply. Use this rule only for that conduct. It sits separately from the ordinary $25 schedule.[15]

For lawn care, the association may do the work and charge the owner. That happens after a 10-day written notice asking for the maintenance. Other repair costs and remedies appear in the rules. These are documented powers. This review does not show how often they are used. Current Texas law controls any conflict with an older remedy.[3][14]

Hallies Cove landscape questions

What happens if I get no answer in 30 days?

The window is 30 days after receipt. Plans without approval by then are treated as disapproved. Get the written decision before work. Keep the approved plan and its conditions.[3]

Can I remove a dead or unsafe tree?

The removal rule has an exception for a diseased, dead or unsafe tree. Ask how to document it before cutting. Keep useful photos or an arborist's assessment. Plan to keep at least two trees on the lot.[3]

Which application and fee should I use?

Confirm them with the current manager before sending plans or money. The November 2026 certificate names Frontier. The older application names DAMC. A fixed current landscape-review fee remains unverified.[2][4][3]

Plan your Hallies Cove yard

Texas Allied Landscape can turn your ideas and lot requirements into one landscape plan. We can help check the current manager, application, trees and drainage needs. We prepare the review package. Then we install and care for the approved yard. Share your address and what you want to change. Do this before buying plants or scheduling a crew.

Plan a landscape project with Texas Allied Landscape.

Explore our community guides.

How we score communities.

Scope of the document review

The First Amendment changes building setbacks. The 2019 Board action covers records, retention and payment plans. It also covers related policies. The located 2024 annexation adds land to the declaration. Its field notes define the area. These records were checked as part of the rule chain. None adds a plant palette.[11][16][17]

Your community profile

Hallies Cove in Schertz has a landscape-review process. It has a two-tree minimum. It also has rules for drainage and yard care. Check the unit, block and lot on your deed and survey. Do this before applying a rule to your home. The original 2017 coverage began with Units 1 and 2. Later annexations cover Unit 3, Unit 5, Unit 4A and more land. A January 2026 notice adds The Court at Hallies Cove. It places The Court under the Hallies Cove declaration and association.[3][18][19][20][21]

Community profile

Hallies Cove

Written approval, trees and drainage shape the work. The two numeric scores describe the named declaration; current manager, fee and additional standards remain flagged.

Spider chart of the axis scores: Approval scope 5/5, Approval layers 1/5. The table lists the same values.Designlatitude—Approvalscope5/5Approvallayers1/5Approvalcost—Planpreparation—Enforcementcapability—

1 permissive5 protective

Scores by axis
Design latitude—
Approval scope5/5
Approval layers1/5
Approval cost—
Plan preparation—
Enforcement capability—

Higher means more documented control or burden, not a better community.

Declaration, amendments, located annexations, bylaws, policies and native plats read November 10, 2026. County index certified through November 5. November 2026 certificate conflicts with older DAMC routing. Bounded review, not a title opinion.

  • Design latitude

    —

    1. 1
    2. 2
    3. 3
    4. 4
    5. 5

    How much of the plant and design palette is prescribed. A higher score means less design freedom.

    Why this score

    Your landscape needs review, at least two trees and ongoing care. Added ACC rules may apply. A complete current plant or turf standard remains unverified, so design latitude stays unscored.

  • Approval scope

    5/5

    1. 1
    2. 2
    3. 3
    4. 4
    5. 5 (this score)

    How much exterior work needs written sign-off.

    Why this score

    Get written ACC approval for landscaping and other improvements before work. Submit plans and specifications. Plans not approved within 30 days after receipt count as disapproved. This score covers the reviewed 2017 rules; later requirements may still need a check.

  • Approval layers

    1/5

    1. 1 (this score)
    2. 2
    3. 3
    4. 4
    5. 5

    Counts distinct required community reviewers only. City, county and state permits, optional steps and repeat submissions are not counted.

    Why this score

    Routine work goes through one ACC. A Board appeal or a special variance applies only when needed. The manager-routing conflict does not add another committee approval.

  • Approval cost

    —

    1. 1
    2. 2
    3. 3
    4. 4
    5. 5

    What the community's own approval process costs to apply.

    Why this score

    A reasonable application fee and added architect or engineer review costs are allowed. A fixed current landscape fee remains unverified. Property-transfer charges do not set the application price.

  • Plan preparation

    —

    1. 1
    2. 2
    3. 3
    4. 4
    5. 5

    How much drawing and documentation an application needs.

    Why this score

    Prepare site and exterior plans with specifications. The older form also asks for a survey where needed, materials and colors. Confirm the current manager and form before submitting; the complete current package stays unscored.

  • Enforcement capability

    —

    1. 1
    2. 2
    3. 3
    4. 4
    5. 5

    Which remedies the verified governing documents and adopted policies provide. The score reflects verified documented provisions, not observed enforcement practice or legal conclusions. Not finding an express clause is not a conclusion that no authority exists.

Confirm the current manager first

The November 3, 2026 recorded management certificate names Frontier Association Management. The older public document library and application still name a different manager. That is Diamond Association Management & Consulting, or DAMC. The new certificate also has Hunters Ranch template wording. It refers to an Attachment I that is missing from its four recorded pages. Ask Frontier to confirm the current Hallies Cove application, reviewer and fee. Do this before sending plans or money. The older DAMC form's current use remains unverified.[2][4][22]

This guide uses the declaration, two amendments and the located annexations. It also uses the bylaws, formation documents and recorded policies. Native county plats were read for the review as well. The county search was checked November 10, 2026. Its index is certified through November 5. Later records may still need a check. This review is not a title report. Additional ACC rules are allowed. Get the current set for your lot.[3][23]

Sources

  1. Older DAMC Hallies Cove ACC page . Public page read November 10, 2026. Older process and 30-day advance request; current routing unresolved. Read November 10, 2026.https://damc8801.eunify.com/page/1370ab
  2. Management Certificate, November 2026, document 20260215211 . All four recorded pages read. Frontier named; Hunters Ranch language and absent Attachment I flagged, not resolved. Read November 10, 2026.https://bexar.tx.publicsearch.us/doc/332223719?highlight=HALLIE%2A%20COVEabcd
  3. Hallies Cove Declaration, 2017, document 20170222223 . Sections 3.12, 3.14, 3.18, 3.27 and 5.2-5.4; all 32 body pages and recording page read. Original embedded plats are degraded; later native county sheets checked separately. Read November 10, 2026.https://damc8801.eunify.com/PublicDocuments/Download?doc=50908abcdefghijklmnopqrstuvwxy
  4. Older DAMC Home Improvement Request Form . Both pages read. Historical submission route, not verified as current after the November 2026 certificate. Read November 10, 2026.https://damc8801.eunify.com/PublicDocuments/Download?doc=50505abcd
  5. Assignment of Declarant Rights, January 2026, document 20260015582 . All four pages read; effective December 31, 2024. Read November 10, 2026.https://bexar.tx.publicsearch.us/doc/291550181?highlight=%2220260015582%22↑
  6. Hallies Cove Unit 1 native plat, 2018 . Recorded June 22, 2018, document 20180120001; general, CPS and TxDOT notes and landscape-buffer labels checked from native county image. Read November 10, 2026.https://bexar.tx.publicsearch.us/doc/16432361↑
  7. Hallies Cove Unit 4A native plat, 2022 . Document 20220232867, native general and CPS notes checked. Read November 10, 2026.https://bexar.tx.publicsearch.us/doc/148595693↑
  8. The Court at Hallies Cove native plat, 2026 . Document 20260012795, native CPS and City notes and drainage/open-space keynotes checked. Separate park-lot replat 20260012785 also checked. Read November 10, 2026.https://bexar.tx.publicsearch.us/doc/291510010ab
  9. Hallies Cove Unit 3 native plat, 2019 . Three native sheets, documents 20190211497-499, notes checked. County sheets 20001/1524-1526. Read November 10, 2026.https://bexar.tx.publicsearch.us/doc/31235328↑
  10. Hallies Cove Unit 5 native plat, 2020 . Four native sheets, documents 20200272661-664, notes checked; public park, drainage and utility provisions. Read November 10, 2026.https://bexar.tx.publicsearch.us/doc/92716757↑
  11. First Amendment, 2018, document 20180143784 . All four pages read; Section 3.5 setback change. Read November 10, 2026.https://damc8801.eunify.com/PublicDocuments/Download?doc=50905abcde
  12. Texas Property Code Chapter 202 . Current text read November 10, 2026; Sections 202.007, 202.008, 202.022 and 202.023. Read November 10, 2026.https://statutes.capitol.texas.gov/Docs/PR/htm/PR.202.htmabc
  13. Schertz Ordinance 17-S-04 and development standards . Adopted January 24, 2017. Full accessible text read, including development standards and exhibits. Historical PDD, not current permit determination. Read November 10, 2026.https://laserfiche.schertzweb.com/WebLink/docview.aspx?dbid=1&id=331582↑
  14. Fine and Enforcement Policy, 2021, document 20210014636 . All four pages read; separate from Second Amendment drainage-dumping provision. Read November 10, 2026.https://damc8801.eunify.com/PublicDocuments/Download?doc=50904ab
  15. Second Amendment, 2021, document 20210013625 . All three pages read; Section 7.4 drainage-dumping penalty and costs. Read November 10, 2026.https://damc8801.eunify.com/PublicDocuments/Download?doc=50903↑
  16. Board Resolution, 2019, document 20190019816 . All 11 pages read; records, retention, payment-plan and related policies, not a plant palette. Read November 10, 2026.https://damc8801.eunify.com/PublicDocuments/Download?doc=50910↑
  17. Hallies Cove annexation, 2024, document 20240028620 . All 10 pages read; operative terms, field-note exhibits and recording page. Geographic scope, not a plant palette. Read November 10, 2026.https://bexar.tx.publicsearch.us/doc/194286607?highlight=%2220240028620%22↑
  18. Hallies Cove Unit 4A annexation, 2022 . Operative text and recording pages read; geographic exhibits checked against native plats. Read November 10, 2026.https://damc8801.eunify.com/PublicDocuments/Download?doc=53276↑
  19. Hallies Cove Unit 3 annexation, 2019 . All operative text read; three native Unit 3 plat sheets checked separately. Read November 10, 2026.https://damc8801.eunify.com/PublicDocuments/Download?doc=50911↑
  20. Hallies Cove Unit 5 annexation, 2020 . All supplied pages read. Unit 4A and Unit 5 scope also checked in the located annexations and native plats. Read November 10, 2026.https://damc8801.eunify.com/PublicDocuments/Download?doc=50909↑
  21. Notice of Applicability, January 2026, document 20260015748 . All three pages read. Expressly links The Court plat to the 2024 annexation and the 2017 declaration. Read November 10, 2026.https://bexar.tx.publicsearch.us/doc/291551653↑
  22. Frontier Association Management website . Contact page read November 10, 2026. Website lists (210) 510-0370. Its address differs from the recorded certificate; no claim that its public site confirms a Hallies application route. Read November 10, 2026.https://www.frontierhoa.com↑
  23. Hallies Cove formation/bylaws filing, 2017, document 20170222224 . 20-page posted bylaws and 8-page formation copy read; county notice/exhibit pages 1-11 recovered and read. The 31-page bundle is not 31 pages of bylaws. Read November 10, 2026.https://bexar.tx.publicsearch.us/doc/13686880?highlight=%2220170222224%22↑