
Property owners
Waterford Park Landscaping
Make your Waterford Park yard a place to relax, gather and enjoy plants. We bring the design, irrigation and review package together for your home.
Get a quoteIllustration based on reference photos of Waterford Park. Not a single literal view.
On this page
Waterford Park sits west of the Alamo Ranch shopping area, with dining and shops nearby.[1] At home, your yard can give you a place to relax, share a meal or enjoy the plants you love. Texas Allied Landscape helps bring those ideas together. We plan planting, outdoor spaces and irrigation around your home. Then we prepare the review package for your lot and project.
From yard ideas to an approved plan
Get written approval before landscaping, clearing, grading, or removing trees and plants. Show the work's type, shape, height, materials, color and location. Visible features need to fit the community's look.[2]
Your contractor also needs approval before work. A homebuilder buying lots from the developer has an exception. Ask for the current application details and review fees as the plan takes shape.[2][3]
Send the landscape plan and contractor's name.
Include the plans and project details. The review committee has 30 days after submission to approve or deny. If it gives no answer in that time, the approval requirement in this rule no longer applies. We plan for a written decision before work. We also check the rules for your unit.[2]
Keep the fence-plan deadline separate.
Fence plans have their own 10-day rule for no answer. Use that deadline only for fence plans. Have your unit's requirements and written decision checked before installation.[2]
Fit the layout to your lot
For Units 1-2, start with the minimum setbacks below. On cul-de-sac curves, the review committee sets the front setback.[4]
Landscaping, steps, walkways, driveway access, paved parking and qualifying planters may be allowed in setbacks with approval. Have planter height and clear views at intersections checked as part of the design.[2]
Keep natural drainage open. Plan for water flowing from other lots as well as your own. Fences, walks, beds and other features need safe drainage. Preserve natural grade and vegetation when laying out paving and improvements. Keep easements accessible.[2]
Units 1-2 setback guide
These are selected edges from the 2014 rules. One interior side is shown. The other side and corner-street depth are not drawn. Have approved work in setback areas checked against the full rules.[2][4]
Hover over the drawing to magnify it.Press and hold the drawing to magnify it.With a keyboard, focus the drawing and press Enter or Space to open the magnifier, use the arrow keys to move it and Escape to close it. Every distance is also listed below.
- Property boundary
- Building setback (no buildings past this line)
- Vegetation preserve (natural vegetation stays)
- Easement (utility or drainage access)
- Project footprint (proposed work)
The dashed lines mark where buildings may not go. Inside the setback lines, other limits (easements, ACC) still apply.
Band widths are drawn in proportion to each other; the lot is a schematic rectangle, not a survey.
Planting, lawn and water
Keep the front yard planted
Rock and material other than mulch or vegetation may cover up to 25% of the front yard. Approved driveways and sidewalks are excepted. Build that limit into the layout from the start.[2]
Have the current approved-plant list, lawn choices, tree counts and any artificial-turf proposal checked before buying. Those details have not been verified in the records read for this guide. We help prepare a plant palette for review.
Plan fences, screens and lights together
For Units 1-2, fences beside or visible from a street must be cedar. Other fences may be cedar, spruce or wrought iron. Fences must be six feet high. Wood slats must touch, and the smooth side must face outward along streets. Chain link is prohibited. Get approval for wood stain.[2][4]
The review committee may require plants to screen a fence. Have the first fence's submission requirements checked in the design guidelines. For other units, check the separate supplement.[2][4]
Repair fence damage within 30 days of written notice from the association. Screen trash containers with plants or fencing except for pickup. Yard lights need approval unless installed with the home's original construction.[2]
Include irrigation and oak care
Keep pipes and tanks buried. Temporary irrigation hoses and movable irrigation pipes are allowed. Items with written approval are also allowed. Rainwater harvesting is encouraged. Above-ground collection tanks may be considered through review. Have the current system-specific guidelines checked for your plan.[2]
Oak care includes steps to prevent oak wilt, dress wounds, respond to infected trees and use trenching where required. We work with a qualified arborist. Together we assess the tree and site using the association's requirements and current guidance.[2]
Project timing, costs and yard care
Finish the approved work
For work other than new-home construction, finish within a reasonable time after starting. You can also finish within the period set by the review committee. A written exception may be granted.[2]
You may request a certificate of compliance in writing. You pay its preparation and recording costs.[2]
Check fees before submitting
Have the current landscape-review fee checked in the design guidelines. It remains unverified in this guide. The $500 new-home origination fee is a separate charge. It does not establish a landscape-review fee.[2]
Keep the yard healthy
Keep front and back lawns below six inches. Maintain plants, watering, drainage and easements. A written yard-care notice may give 10 days to do the required work. After that, the association may arrange care and charge the owner. A separate exterior-maintenance process gives 15 days to correct a problem. Its costs are charged to the lot or owner. Keep those clocks separate.[2]
Notices, fines and repair costs
Unapproved work may lead to orders to restore or remove it. It may also lead to legal action, damages, court orders, and costs or attorney's fees as limited by law. Common-area rules have separate fine, notice and hearing provisions. Violation fines may also be adopted.[2]
The recorded 2019 violation process starts with a courtesy notice and 10 days to correct. It then steps through intended and applied fines of $25, $50 and $75. After that comes $75 every 10 days while the problem continues. Attorney and court action may follow.[5]
For violations covered by the 2026 self-help and forced-maintenance process, the first courtesy notice gives 15 days. A certified-mail notice of intent to send a contractor follows. The association may then send the contractor and charge the owner. Other violations stay under the current violation-enforcement process. How often these steps are used has not been verified.[6]
Waterford Park landscape questions
Planning your yard
Can I use rock in the front yard?
Rock and material other than mulch or vegetation have a 25% front-yard cap. Approved driveways and sidewalks are excepted. We can help balance planting and hard surfaces within that limit.[2]
Which setback rules apply to my yard?
The diagram covers Units 1-2 only. The minimums shown are 20 feet at the front, 15 feet at the rear and 5 feet on an interior side. The committee sets the front depth on cul-de-sac curves. Have your unit and lot checked before using these dimensions.[4]
Does my landscape contractor need approval?
Yes. Get contractor approval before work. The stated exception is a homebuilder buying lots from the developer. We help put the contractor's details into the review package.[2]
Plan your Waterford Park landscape
Bring your survey and ideas for spending time outside. Texas Allied Landscape helps design the yard, prepare the review package, install the approved work and care for the finished landscape. We check the rules for your unit as the plan comes together.
Sources and lot coverage
The rule summary is based on the 2014 declaration and Units 1-2 supplement, plus the 2019 violation process and 2026 self-help process cited below. The 2024 management certificate helps identify the association and unit records. Separate design guidelines, later amendments and other units remain unverified. Have the current documents and your lot's coverage checked before work.[2][4][3][5][6]
Your community profile
Community profile
Waterford Park
1 permissive5 protective
| Design latitude | — |
|---|---|
| Approval scope | 5/5 |
| Approval layers | 1/5 |
| Approval cost | — |
| Plan preparation | — |
| Enforcement capability | 3/5 |
Higher means more documented control or burden, not a better community.
Dated 2014 declaration/Units 1-2 ratings; we check current requirements for your address. No combined score. Later amendments unchecked.
Design latitude
—
- 1
- 2
- 3
- 4
- 5
How much of the plant and design palette is prescribed. A higher score means less design freedom.
Why this score
The front-yard rock limit and design review shape your choices. Separate guidelines may add lawn, plant and tree rules; these have not been verified.
Approval scope
5/5
- 1
- 2
- 3
- 4
- 5 (this score)
How much exterior work needs written sign-off.
Why this score
Get written approval for planting, removal, building and visible changes. Include plans and details. Contractors also need approval, with an exception for a homebuilder buying lots from the developer.
Approval layers
1/5
- 1 (this score)
- 2
- 3
- 4
- 5
Counts distinct required community reviewers only. City, county and state permits, optional steps and repeat submissions are not counted.
Why this score
One committee reviews the work and contractor. Its members and consultants work within that review. Extra land may have another committee. Check the route for units beyond those covered here.
Approval cost
—
- 1
- 2
- 3
- 4
- 5
What the community's own approval process costs to apply.
Why this score
Check review fees in the separate guidelines. The $500 new-home origination fee is a different charge and does not establish the landscape-review fee.
Plan preparation
—
- 1
- 2
- 3
- 4
- 5
How much drawing and documentation an application needs.
Why this score
Plans need to describe the work. The separate guidelines set the format, contents and any stages of submission; these have not been verified.
Enforcement capability
3/5
- 1
- 2
- 3 (this score)
- 4
- 5
Which remedies the verified governing documents and adopted policies provide. The score reflects verified documented provisions, not observed enforcement practice or legal conclusions. Not finding an express clause is not a conclusion that no authority exists.
Why this score
The recorded 2019 resolution sets a courtesy notice with 10 days to correct, then applied fines of $25, $50 and $75, continuing at $75 every 10 days while unresolved, with attorney escalation and fees charged to the owner.
The layout and fence rules below cover Units 1-2. Have your unit and lot matched to the right rules before choosing materials. Other units need their own supplement checked.[4][3]
Separate design guidelines may add stricter requirements. The current guidelines, later amendments and other units have not been verified for this guide. We help gather the current set for your address.[2][4][3]
Sources
- Lennar Waterford Park community introduction, November 6, 2014 : location context west of Alamo Ranch, shopping and dining; checked November 11, 2026. Historical prices and planned amenities are not used as current claims.https://resourcecenter.lennar.com/our-communities/lennar-san-antonio-opens-new-welcome-home-center-waterford-park-northwest-san-antonio/↑
- Waterford Park Declaration, August 2014, Doc. 20140134951 : all 50 pages of extracted text read November 8, 2026; key review/landscape pages visually checked. Definitions; Articles II-V. Division 3.1: committee; sections 3.4.6, 3.4.8 and 3.4.10: review, submissions and remedies; division 3.5: review fees; section 4.3.10: front-yard material limit; section 4.3.9: rainwater harvesting; section 4.6.5: ten-day yard-care notice; section 2.5.1I: fifteen-day exterior-maintenance process; section 2.5.1K: common-area rules, fines, notice and hearing; divisions 5.5-5.6: legal remedies and fines. Later amendments unchecked.https://bexar.tx.publicsearch.us/doc/12831766abcdefghijklmnopqrstuv
- November 2024 management certificate, Doc. 20240206279 : entity/unit index, not landscape rules.https://www.hoa.texas.gov/sites/default/files/certificates/152427/2101-23868/mc/6309%20001%20Recorded%20Managrement%20Certificate.pdfabcd
- Units 1-2 Supplemental Declaration, August 2014, Doc. 20140134952 : Sections 1.1, 1.5, 2.1, 3.1; all four pages read/visually checked. More restrictive provision controls a same-subject conflict with the declaration.https://bexar.tx.publicsearch.us/doc/13000481abcdefghijk
- Violation enforcement resolution, recorded December 2, 2019, Doc. 20190242983 : violation schedule table on page 6 - courtesy notice, escalating intended and applied fines, attorney and court escalation; page images read November 8, 2026; other recorded policy bundles not yet read.https://bexar.tx.publicsearch.us/doc/37328402ab
- Self-help and forced maintenance enforcement resolution, effective February 1, 2026, Doc. 20260131599 : fifteen-day courtesy notice, certified-mail contractor intent, contractor cure at owner cost; other violations stay under the violation-enforcement resolution; page images read November 8, 2026.https://bexar.tx.publicsearch.us/doc/321370951ab
